Bathroom Interior Design
Waterproofing, fittings, storage and finish sequenced correctly — so problems don't surface six months after handover.
What We Design
Structural waterproofing done and cured before any finish work starts — the step most renovations skip.
Fixtures selected for daily durability, not just showroom appeal.
Vanity units and wall-mounted storage that keep small bathrooms usable.
Layout-planned tiling to minimise cuts and visible seams.
Exhaust and lighting planned together to control moisture and mood.
Grab bars, level thresholds and slip-resistant flooring on request.
Why AIP Bathroom
Most bathroom problems are invisible on handover day — poor waterproofing shows up as a damp ceiling downstairs six months later. We treat waterproofing and drainage slope as the actual first phase of the project, before a single tile is chosen.
Get Your EstimateRecent Work
FAQ
2-3 weeks for a full renovation including waterproofing cure time, depending on size and scope of civil work.
Yes — most leaks are invisible until they've caused damage. We treat waterproofing as standard on every bathroom project, not an optional add-on.
Yes, we sequence work and dust-proof adjoining areas so the rest of the home stays usable.
Yes, including grab bars, level-entry showers and slip-resistant flooring, on request.
Explore More
A complete design and execution service for your whole home — space planning, materials, lighting and furniture, run on one schedule.
Modular KitchenStraight, L-shape, U-shape or island layouts — storage, worktop and finish planned for daily use, not just for the render.
WardrobeSliding, hinged and walk-in wardrobes with internal storage planned around what you actually own.